A checklist for liquid-cooled data center loops, built on OCP and ASHRAE TC 9.9 guidance. Log evidence on site, check each measurement against your project spec, and hand over a readiness report.
ATT. 02 · Filter change, stage 2
14 Oct, 10:41 · ΔP 9.6 psi
Element 100 µm → 25 µm
The work gets done. Proving it, loop by loop, to a commissioning agent is where days disappear.

By closeout, field records sit across checklists, photos, emails and several spreadsheets. Someone has to rebuild the story for the CxA.
Source: Anvilfield field guideCold-plate performance issues are being traced back to incomplete flushing or filling that left particles in the loop.
Source: Ecolab interview, Oct 2026There is still no single end-to-end standard for liquid-cooling pre-commissioning, so each owner and CxA sets their own list.
Source: CxPlus, May 2026
Loop type, coolant, stainless, cleaning method, drain access and witness. The checklist adapts to your answers.
Tick each item, enter your measurements, and see at once whether they meet the project criteria.
Status, open items, readings and sign-off lines, ready for your CxA or the owner.
Each item names the evidence to keep and the guidance it comes from. Enter your project's acceptance criteria once, and every measurement is checked against them. Your entries stay in this browser.
Generated from your checklist and readings. It updates as you keep working.
Everything the free checklist does, plus the parts that take the longest today.
Something else? Ask when you get the template by email; replies come from the person building LoopReady.
Yes. The checklist, acceptance criteria, readings log and readiness report are free. We ask for an email to generate the report, and the blank template downloads right away.
Your checklist, criteria, measurements, notes and project names stay in your browser on this device. When you generate the report, we receive your email, company, role, loops per month, who does your flushing, the boxes you ticked, the loop type, how far the checklist is completed, how many criteria are confirmed or out of spec, and the link you came from. We also count anonymous page usage, without cookies.
The OCP guidelines for TCS pre-commissioning, the OCP integration and logistics white paper, the ASHRAE TC 9.9 bulletin of May 2026 on coolant integrity and readiness, plus Vertiv and Schneider Electric deployment guidance. Where sources differ (for example on chemical cleaning), the item says so. Sources are linked at the bottom of the page.
No. It helps you prepare the evidence they ask for. Manufacturer instructions, site procedures and your commissioning authority always take precedence. The OCP values are only a starting reference: your project spec sets the acceptance criteria.
LoopReady is built by NEOO Technologies, founded by a QA and test management lead with 15 years of experience in test evidence and acceptance.
Start from the OCP reference values, then enter your project spec.